Barton Hill Closure - 12th November 2018

/WSOH-S50-Early-notice-letter-Barton Hill Closure.30.10.18.pdf

/Barton-Hill-S50-diversion-route.pdf

Update

Following the issue of the ‘unknown’ location of the gas main; our contractor has been working closely with the gas provider to determine and locate the actual position. This in turn has not had such a negative effect as previously envisaged and works have been able to commence as originally planned.
 
I can confirm, that the works to Barton Hill will be complete this side of Christmas with all traffic management being removed by close of play 21.12.18. The road will be opened and back to normal operation as of 22.12.18.
 
All that is left to do in the New Year is to pressure test the installed pipework, but this operation does not require any road closures and/or traffic management.
 
On behalf of Morgan Sindall, I would like to wish you all a Merry Christmas and a happy new year.